Thursday, May 26, 2011

Updates

I'm sure work has been done on our house over the past week or so, but the house hasn't looked all that different to us since the drywall has been hung. Until today. I know they are moving fast, but it was nice to see something different when I visited the house today. The cabinets were being installed. Our PM said a few were damaged and had to order a few new ones. Our countertops and fireplace were also being installed. And our furnace was installed yesterday. Enjoy the pics.








Thursday, May 19, 2011

Ryan Homes Made a Huge Mistake!!!

First off, I have to share an experience similar to a fellow blogger. My wife and I pulled up to our house to find two individuals, what appeared to be a slightly older couple, opening our garage door (that was shut) and walking into our house. Agreed that people walk through new construction all the time and we’re not overly worried, but it was strange to see it happen in front of our eyes. Especially considering it’s wasn't just the frame that was up. The garage door was shut! Not to mention, it turns out they don’t even live on our street. The live a few streets over. The women kept commenting that they’ve been through every house on our street and they liked our layout the best. (So do we, that’s why we picked it), but the guy was definitely embarrassed.

Anyways, we (my wife and I), then walked through our house. It’s coming along great. We didn’t take a ton of pictures because it was getting dark. Onto the story…

When deciding on upgrades for the house there was one that we really wanted to include but decided to cut it. You have to some where. It was the Jacuzzi tub. We did special order a 6 foot tub so I could fit, but the $1600.00 upgrade for jets, motor, and pump seemed a little steep. It was one of those wants more than a necessity, but we still almost added it up to the last second and the justification wasn’t all that hard, having been rear ended in a car accident recently and hurting my back, thought it would be really nice. But we stuck to our guns and just kept a basic 6 foot tub. By the way, the tub is not only a foot longer, it is also wider. Yeah.

So when seeing the tub for the first time, in the dark, I noticed there were jet nozzles around the tub. This upset me. Thinking back, when we were quoted for the 6 foot tub we WERE going to get the jets. So it makes sense that they quoted us for a tub with the jets, and the $1600.00 upgrade would be for the installation of the motor and pump and what not. Well seeing the jets I couldn’t help but think, you have to be kidding me. How obtrusive do jets look in a huge tub unless they are hooked up to a motor. It seems more like a hassle with water going in the holes and potential mold issues not having water actually run through them. I figured they would have ordered a regular 6 foot tub without the jets. So today I got on the phone and called our project manager (I know I’ve said this before, but it deserves being said again, our PM rocks!!!)

To make the rest of the story short (sorry, I know I’m past that), he said his paper work showed a tub with jets (thinking back this makes sense), so he had the motor and pump all installed for us and didn’t think twice about it. That’s right, WE NOW HAVE A 6 FOOT JACUZZI TUB!!! And the best part about it is, WE DIDN’T HAVE TO PAY FOR IT!!! Ryan Homes makes a huge mistake in our favor…yeah us and our PM!!! Even when it doesn’t always feel like, our angels are really looking out for us!!! Our PM said he double checked with the electrician or whoever ran everything for the motor and they said they have already been paid by Ryan Homes for the job. So whats done is done. Free upgrade, NO COMPLAINTS HERE!!!




On another small note, our countertops were in our garage…can’t wait to see them installed with our cabinets, rugs, and everything else.   


Wednesday, May 18, 2011

Suprise!!!

Lilly has been walking with her shopping cart the past few days and I finally caught it on video. Enjoy!



And then she took her first steps!!!

Saturday, May 14, 2011

Our PM Called Us Today

We got a call from our PM this afternoon. That's right, on a SATURDAY. I wasn't sure what to expect, I figured it was in regards to one of the handful of "special projects" that our PM agreed to tackle for us. (Our PM is great if I havn't mentioned that before). And as it turns out, they were working on our house today. Definately wasn't expecting that. I knew our drywall was delivered yesterday because we drove by and apparently today its 90% hung. He said they will be done hanging the rest of it first thing Monday.

Wow, that was fast!!! He said by the following Monday or Tuesday the drywall would be complete (tape, mud, etc) and the siding should be going up later next week or early the following week. Pretty cool. I will post pics next time I swing by, which will probably be tomorrow...have to check the unexpected progress!!!

Wednesday, May 11, 2011

Had Our Pre-Drywall Today!!!

I just got back from our pre-drywall meeting with our project manager and our inspector and it went great. Our inspector was extremely pleased with the work…he didn’t see any shortcuts taken. In fact, in most cases our project manager had well exceeded the norm for doing things. For example, they sprayed foam insulation around duct work and electrical, creating a higher R value, which to me means lower energy bill!!!



And he loved how the spring in the garage door was enclosed (it will now last longer). Our inspector said this is a brand new thing that he has not seen in many houses.   


The spring is in the bar above the garage door

Also, all the electrical was stapled to the joists nice and neatly…including my speaker wire for the surround sound in the family room and two additional speakers (1 in living room and 1 in dining room)…will be great for entertaining.


And while we were leaving, the framer was there adding blocking to make mounting the tv above the fireplace...another thing our project manager said he would take care of for us.

The black tube is the future tube above the fireplace...so cords can run to the tv and be hidden behind the walls.

Our insulation is going to be put in tomorrow and then drywall starts. I can’t wait to see how the house transforms next week...so excited!!!

Friday, May 6, 2011

Pre-Drywall Meeting Set

We scheduled our pre-drywall meeting today for Wednesday of next week and our inspector (my uncle) will be there as well to do his inspection at the same time. That way he will be able to ask more detailed questions and understand any info that might be a little over our head. He also advised, as I have seen on other blogs, to bring our camera to take lots and lots of pictures of where everything is.

Also, we drove by the house today and the house next to us that didn't have a sold sign, basement has been dug. Hopefully we have nice neighbors!

Wednesday, May 4, 2011

We Have A Roof Over Our Head!!!

The house is wrapped and the shingles are up. The concrete has been poured in the garage and the basement, and the plumbers and electricians have been working the past few days. Spoke with our PM today and he wants to schedule our pre-drywall meeting for next week. WE CAN'T WAIT!!! It's going by so fast, and yet not fast enough.